2. Below is the “Start New EnergyStar Application” page.
3. The “Energy Star Manufacturing Partner” field is a lookup field, which means that you can start typing in either the name of the partner or their partner organization ID, and the top 100 items matching will be listed. Keep typing until you find the partner you want.
4. Select from the “Available Energy Star Schemas” in the dropdown list.
5. Click the button
Your current working models will not save until you click
If a new application is left open and no actions are performed for over 30 minutes, the session will be automatically terminated and any unsaved data will be erased. Please go to the bottom of the “EDIT APPLICATION DETAILS” page and click on “SAVE CURRENT MODEL” often. This will save your current working submission without the risk of loss.
You can be sure that your model has been saved when you see the “Model has been saved.” confirmation message at the bottom of the screen:
• In What Markets Is this Model Sold? – Select from below checkbox (multiple choice)
Australia
New Zealand
Canada
Europe
Japan
Switzerland
Taiwan
United States
• Notes - Blank
• Product Type – Select from Indoor Non-Directional Luminaire Indoor/Outdoor Non-Directional Luminaire or SSL Surface Mount Retrofit - Directional Luminaire
• Indoor/Outdoor – Select from Outdoor Luminaire – Indoor Directional Luminaire
• Qualification Status – Select from Conditional Qualification, Full Qualification – Full Qualification (6000hrs testing)
• Date Fully Qualified – Blank - It takes 6000 hrs to be fully tested so the answer is “blank” if full testing has not occurred at the time of the form being filled out.
|
|
• In What Markets Is this Model Sold? – Select from below checkbox (multiple choice)
Continued on the next tab…
|
Continued on the next tab… |
Continued on the next tab… |
We are seeking feedback from you! Please share your good or bad experience working with us here: